Project score
Connectivity score
Location score
Investment score
Launch Date : Mar 2014
Possession : Ready to move
Ready to Move in
Number of Units : 64
Tower Details : Number of towers:1
Floor Details : 4+Ground
Furnished? : Unfurnished
Bangalore Electricity Supply Company (BESCOM):
Occupancy Certificate:
Swimming Pool
Children's Play Area
Club House
A Well Equipped Gymnasium
Rain Water Harvesting
StructureLift Make : Kone, Schindler or similar make Main Door : Teak wood frame with veneer skin on both sides ![]() Toilet Door : Red sol frame with flush shutters ![]() Other Internal Door : Red sol frame with flush shutters |
Window![]() Thickness of inner and outer walls : 6" solid Blocks for outer wall | 4" solid blocks for inner walls |
Flooring![]() Individual Unit Foyer, Living & Dining : Vitrified tiles flooring ![]() Master Bedroom : Vitrified tiles flooring ![]() Kitchen : Vitrified tiles flooring ![]() All Bedrooms : Vitrified tiles flooring ![]() Balconies & Utility : Ceramic tiles flooring ![]() Toilets : Ceramic tiles flooring |
False Ceiling![]() Toilets : Ceramic glazed tiles up to 7feet ![]() Kitchen : Glazed ceramic tiles dado up to 2 feet on the platform |
Kitchen![]() Granite counter and Sink |
Painting![]() Internal Walls & Ceilings : Plastic emulsion ![]() External finish : Cement and weather proof paint from Nippon brand |
Electrical Outline Specification2 BHK Flat : 3KVA 3 BHK Flat : 4KVA ![]() Concealed PVC conduits with Copper wiring ![]() Modular Switches of reputed make : Anchor, GM or similar |